Key Takeaways
- 01Savings identified are not savings delivered: Bain found seven in ten procurement teams lost at least 25% of the savings yield they identified, so a savings target alone misleads.
- 02Deloitte's 2025 survey of over 250 CPOs shows the barriers to value are organisational: silos 57%, competing priorities 46%, execution capability 40% and the talent gap 34%.
- 03Leaders are measured differently. Inverto finds 56% of impact leaders use company-wide KPIs such as revenue and margin growth, and top teams deliver +2% higher revenue growth.
- 04Supplier innovation is the clearest growth lever: Deloitte reports innovation enablement at 56% of top performers against 24% of others, and 34% of companies rely on supplier-led innovation.
- 05Replace the savings target with a three-tier scorecard of cost, value and resilience, validated by finance and phased over about eighteen months.
The Karter McKinley perspective
Score procurement on value contributed, not cost avoidedKarter McKinley
Our view is that a savings target is the wrong primary measure for a modern procurement function. It rewards the behaviour that is easiest to prove, and punishes the behaviour that matters most for growth: bringing in a supplier that creates new revenue, protecting supply that sustains existing revenue, and shaping demand before it becomes spend. A function measured only on cost avoided will, quite rationally, behave as a cost function, and boards will continue to treat it as one.
We would therefore change the scorecard before changing the organisation chart. Keep a savings floor, validated by finance. Add supplier-led innovation value, speed and working capital. Add resilience measured as revenue protected. The CPO then has a basis for a different conversation with the CEO and CFO, and for different behaviour in the team. This is a management view, not a promise of results: the evidence for causality is suggestive rather than proven, and each business should test the scorecard against its own data.
Savings targets no longer explain what procurement is worth
For two decades the CPO's report card has been a savings number. It is easy to state, easy to audit against last year's price and easy for a board to approve. It is also a narrow lens. Bain & Company noted in 2022 that Fortune 500 companies oversee the purchase of more than $5 trillion in goods and services, and that seven out of ten procurement teams saw at least a 25% savings yield loss from their savings initiatives. Money identified is not money delivered, and the boardroom has noticed.
The loss has identifiable causes. Contracts negotiated by procurement are not always used by the business; maverick buying and non-compliance erode agreed prices; demand is not changed when specifications could be; and savings are booked against budgets that finance then adjusts. The Hackett Group's 2025 benchmark, a vendor study that should be read as such, reports that its Digital World Class teams lose 60% less savings to maverick buying and contract non-compliance than peers. Compliance is a growth issue as much as a cost issue, because it decides whether negotiated terms ever reach the profit and loss account.
A savings number also hides what it displaces. A team incentivised to cut price will favour the incumbent that concedes, not the supplier that would bring a new product, a faster lead time or a better service model. The cost avoided is visible; the revenue not earned is not. Deloitte's 2025 survey of over 250 CPOs across 40 countries frames the question as value delivery and asks what stands in its way. Its answers are the subject of the next section.
The implication for a CPO is uncomfortable but useful. A savings target remains necessary, because cost discipline pays for everything else, but it is a floor rather than a ceiling. The CFO and CEO will increasingly ask what procurement contributes beyond cost: supplier-led innovation, speed to market, protection of supply and working capital. A function that cannot answer will be managed as a cost line. One that can will be invited into strategy discussions.
It is worth separating three kinds of saving, because boards often combine them. Price reductions on existing volumes show in the next period's cost of sales. Cost avoidance, where a price increase is limited, never appears as a lower number and depends on a counterfactual that finance may not accept. Demand savings, where the business buys less or buys differently, belong to the budget holder as much as to procurement. A report that mixes the three overstates the first, and invites the CFO to discount all of it.
What to do: start with an honest audit of savings yield. For the last two years, list savings identified, savings contracted, savings in actual spend and savings in the profit and loss account. The gap between the first and the last is the real conversation with the CFO. Close it by agreeing definitions with finance, then report both the yield and the barriers. Credibility on cost is what earns the right to talk about growth.
The barriers to value are organisational, not technical
Deloitte asked CPOs what prevents value delivery. Siloed ways of working were cited by 57%, competing priorities that dilute focus by 46%, organisational or technology capability to support execution by 40% and the talent gap by 34%. Three of the four are about how the company works, not about which software it owns. A CPO can improve a category strategy in a month; changing how engineering, marketing, finance and procurement agree on a supplier takes much longer.
Silos matter because most value sits at the boundary between functions. A supplier's new component becomes revenue only if engineering qualifies it, marketing launches it and operations plans for it. A procurement team that is not in those conversations cannot bring the supplier to them. The same applies to payment terms, which finance controls, and to demand management, which sits with the business. Procurement leaders who wait to be invited rarely receive the invitation.
Exhibit 1
Organisational barriers, not technology, block procurement value delivery
Top barriers to value delivery cited by CPOs, 2025, % of respondents
Talent compounds the problem. In the same survey, as reported by Procurement Magazine, 45% of CPOs reported increased difficulty recruiting and 30% faced retention issues, and 71% admitted limited to moderate Gen AI knowledge. A function asked to move into commercial and technical partnership needs different skills from one built for tendering: market analysis, negotiation around innovation, data fluency and the ability to speak the languages of engineering and finance. Hiring for those skills in a tight market is slow, so development matters.
Competing priorities are the least discussed of the four. A CPO with a cost target, a risk agenda, an ESG programme and a technology rollout will give each a share of attention, and none gets enough. The way out is to rank by value and drop the rest, rather than to add a growth agenda on top. Boards can help by reducing the number of procurement targets and making the remaining ones outcome based rather than activity based.
Leadership attention is the scarce resource that determines which barrier gets fixed. Deloitte's finding that the leading obstacles are organisational suggests the CPO cannot solve them alone. The CEO and CFO must make decisions about shared objectives, joint governance and the right to challenge specifications. A CPO who brings a short, evidence-based proposal on one barrier, with a named sponsor on the executive team, is far more likely to get movement than one who presents a broad plea for engagement.
What to do: run a barrier diagnostic against the four Deloitte categories. Ask ten stakeholders from finance, engineering, sales and operations where procurement helps and where it blocks. Pick the single barrier that costs most value and fix it within ninety days, for example by seconding a procurement lead to each business unit's leadership team. Report progress on that barrier alongside the savings number.
Leaders are measured on enterprise outcomes, and the results differ
Inverto, a BCG company, surveyed 335 companies and interviewed over 20 CPOs for its 2025 study. It found that only 46% of procurement teams are proactively shaping value at the executive level. The top teams, which actively engage with executives and drive competitive agility, deliver +2% higher revenue growth than average. The figure is modest, but it is a revenue figure, and it comes from teams that were measured on more than cost.
How teams are measured differs. According to Inverto, 56% of impact leaders measure success with company-wide KPIs such as revenue and margin growth, not just savings. Measurement shapes behaviour. A buyer measured on price will negotiate price; a buyer measured on the product margin of a category will ask which supplier improves it. Changing the scorecard changes the daily trade-offs without adding headcount.
Exhibit 2
Digital Masters beat followers most clearly on innovation and stakeholder value
Share achieving each outcome, 2025, % of procurement organisations
Deloitte's Digital Masters, the top quartile of procurement organisations, show a similar pattern. As reported by Digital Commerce 360, 96% of them hit or beat cost-saving targets against 80% of others, and 94% exceeded cost-avoidance goals against 75%. The gap is wider on the softer measures: 84% reported higher stakeholder satisfaction against 59%, and 56% achieved innovation enablement against 24%. Cost performance and value contribution travel together; the best teams do both.
Causality is not proved. High-performing teams may be well resourced first and well measured second. Still, the direction is consistent across Deloitte and Inverto, and no source we reviewed suggests that stronger enterprise measures weaken cost delivery. For a CPO making the case to a CFO, the argument is not to give up savings but to be measured on the broader contribution while showing that cost delivery does not slip.
Governance of the measures deserves as much attention as the choice of them. Every metric needs a definition, a data source, an owner and a rule for disputes. Without these, a scorecard becomes a debating society. Agree the rules before the first report is published, record them in a one-page measurement charter and have internal audit or the finance controller review a sample each year. Boards trust measures they can see being challenged.
What to do: draft a three-tier scorecard covering cost (price, avoidance, yield), value (supplier-led innovation, speed, quality, working capital) and resilience (visibility, dual sourcing, risk events). Agree each measure with the finance director and the relevant business leader. Run it in parallel with the existing savings report for two quarters, then retire the old report. Review the weights annually, and publish them so the team knows what counts.
Supplier innovation is the clearest route from cost centre to growth function
Inverto found that 34% of companies depend on supplier-led innovation for product development. For those companies the supply base is part of the research and development function, whether or not the organisation chart says so. The supplier that suggests a lighter material, a faster process or a new digital service creates value that does not appear in a price comparison. Procurement is often the only function with a relationship across the whole supply base and the commercial tools to shape it.
Deloitte's data points the same way: 56% of Digital Masters achieved innovation enablement against 24% of others. EY's Global CPO Survey 2025, as reported by Procurement Magazine, found 58% of global CPOs prioritising supplier relationships and performance management. Priorities are lining up with the opportunity. What is still missing in many organisations is a mechanism: a way to ask suppliers for ideas, evaluate them and route the best into product and service roadmaps.
Exhibit 3
CPOs plan to use generative AI far faster than they have deployed it
Share of CPOs by priority or status, 2025, %
We would build the mechanism from four elements. A supplier segmentation identifies the strategic innovators separately from the cost-driven suppliers. A structured innovation forum is run twice a year with each strategic supplier and the business owner. An idea pipeline with stage gates, owners and value estimates is held by finance. And contract terms share the benefit, so suppliers have a reason to bring ideas to you first. Each element is simple; discipline is what makes them work.
Visibility matters here too. McKinsey's 2024 Global Supply Chain Leader Survey found that the share of respondents with comprehensive visibility of their tier-one suppliers reached 60%. You cannot manage innovation from suppliers you cannot see, and you cannot protect it from suppliers you know only by invoice. Visibility and innovation are therefore the same investment viewed from two directions, and the same data should serve both.
Suppliers also need a reason to invest in the relationship. A supplier asked for ideas by a buyer who then moves the contract to a cheaper rival has learned not to offer ideas again. Clear commitments on term, volume and benefit sharing for suppliers in the strategic segment change that calculation. The buyer gives up some short-term leverage and gains a supplier that thinks about the buyer's product between negotiation rounds, which is an asset competitors find difficult to copy.
What to do: pick the ten suppliers whose capabilities matter most to the next three product or service launches. Meet each with the business owner and ask for their top three ideas. Log the ideas, estimate value with finance and report to the executive team after six months. Include the innovation value in the procurement scorecard, validated by the finance director, and name the business owner who accepted each idea.
Resilience is a revenue-protection argument, and procurement owns the levers
McKinsey's 2024 Global Supply Chain Leader Survey found 73% of respondents reporting progress on dual-sourcing strategies. Resilience is no longer a niche concern; it is part of the mainstream supply chain agenda. The question for procurement is how to present it. A risk register describes threats; a revenue-at-risk analysis describes what the business would lose, which is the language a CEO uses and the one a board can act on.
Revenue protection can be quantified, roughly. For each critical category, ask what revenue depends on it, how long the business could operate without it and what the alternatives would cost. Multiply the exposure by the likelihood of an event, and compare it with the cost of mitigation: a second source, safety stock or a contract clause. The numbers will be imperfect, but they allow resilience investment to compete with other uses of capital on the same terms.
Exhibit 4
A three-tier scorecard replaces the single savings target
| Tier | Example measures | Validated by | Review |
|---|---|---|---|
| Cost | Price, avoidance, savings yield to the profit and loss account | Finance | Monthly |
| Value: innovation | Supplier-led ideas adopted, with estimated value | Finance and business owner | Quarterly |
| Value: speed and quality | Time to qualify suppliers, defect and delivery performance | Operations | Quarterly |
| Value: working capital | Payment terms, inventory held on supplier terms | Treasury | Quarterly |
| Resilience | Tier-one visibility, dual-sourcing coverage, disruption response | Risk and operations | Quarterly |
| Capability | Skills, retention and data quality in the team | HR and CPO | Annually |
There is a trade-off with cost that procurement must own. Dual sourcing raises unit cost in many categories; safety stock ties up working capital; supplier diversification increases management effort. A savings-only scorecard punishes all three. A value scorecard rewards them when they protect revenue, and that is the argument for changing the measure. Without it, procurement is asked to reduce risk and cost simultaneously and is judged only on the second.
Be careful with claims. Resilience measures are an insurance purchase, and the return is the loss that did not occur. That is hard to prove and easy to overstate. Boards respond better to documented scenarios, tested contingency plans and a record of disruptions handled than to forecasts of avoided loss. Present resilience as a managed exposure with a cost, an owner and a review date.
What to do: rank your categories by revenue dependency and substitutability. For the top ten, document the exposure, the current mitigation and the gap. Present the result to the executive team as a short revenue-at-risk map with proposed actions and costs, and ask for decisions on the three largest gaps. Then add the agreed resilience measures to the scorecard, so the trade-off with cost is visible and owned.
Technology pays back only where the operating model changes with it
Procurement technology investment is rising. Deloitte reports that Digital Masters allocate up to 24% of their budgets to procurement technology, nearly double the relative investment in 2023. The Hackett Group's 2025 benchmark, a vendor study, finds its top performers deliver 2.6X greater return on investment than peers while operating with 31% fewer full-time employees and at 19% lower cost as a percentage of spend. Leaders are investing, and the benchmarks suggest it pays.
Adoption lags ambition. EY's Global CPO Survey 2025 reports that 80% of CPOs plan to harness generative AI, yet only 36% have it deployed in a meaningful manner. Between plan and deployment sits the operating model: data quality, process design, role definitions and change management. A tool installed on top of an unchanged process produces a faster version of the same output.
Exhibit 5
Start with high-value, low-effort moves before larger programmes
Interpret the benchmarks with care. Hackett and Deloitte compare top performers with others, and top performers differ in many ways besides technology. The reported returns may reflect organisation, talent and leadership as much as the platform. A CPO preparing an investment case should use benchmarks to set direction, not to forecast returns, and should build the case from the specific processes to be changed, the hours or errors removed and the value reinvested.
The growth case for technology is not only efficiency. When analysts spend less time on data collection and more on analysis, they can spend time with suppliers and business stakeholders. That is where innovation, risk insight and negotiating leverage arise. Releasing capacity is useful only if the capacity is redeployed, so the plan must name where freed time will go and who will receive it.
People and process determine whether any of this lands. Training budgets, career paths for category managers who move into commercial roles, and rotations through finance and engineering are practical steps that cost little relative to platform spend. Hackett's finding that its top performers provide twice the annual training hours per employee is a reminder that capability is bought with time as well as software, though as a vendor benchmark it should be tested against your own results.
What to do: before the next technology purchase, document the three processes it will change, the baseline measure for each and the role changes that follow. Assign a business owner outside procurement to one of them. Review after six months against the baseline and publish the result, including shortfalls. Credibility on technology benefits is built in the same way as credibility on savings.
A value-contribution scorecard replaces the savings target
Our proposal is a scorecard with three tiers and a small number of measures in each. Cost: price, avoidance and savings yield validated by finance. Value: supplier-led innovation value, speed to market, quality and working capital. Resilience: tier-one visibility, dual-sourcing coverage for critical categories and disruption response time. The scorecard is reviewed quarterly with the CFO and an executive sponsor, and each measure has a named owner and an agreed data source.
The scorecard succeeds only if finance accepts it. Procurement-reported benefits are discounted by every CFO, and rightly. Agree the definitions with finance, let finance validate the numbers, and report both the validated figure and the claimed one in the first year. When the two converge, trust grows and the function can take on more. When they diverge, the conversation is about definitions rather than credibility.
Exhibit 6
An eighteen-month path from savings target to value scorecard
- 01
Audit savings yield
Trace savings from identified to profit and loss; agree definitions with finance.
- 02
Diagnose barriers
Interview stakeholders on silos, priorities, capability and talent; pick one barrier to fix.
- 03
Segment suppliers
Separate strategic innovators from cost-driven suppliers; assign business owners.
- 04
Pilot innovation forums
Run structured sessions with a handful of suppliers; log ideas and value.
- 05
Publish the scorecard
Release cost, value and resilience measures with baselines; retire old reports.
- 06
Embed and extend
Add categories, link measures to objectives, review weights each year.
Progress will take about eighteen months and should be staged. In the first quarter, audit yield and agree definitions. In the second and third, segment suppliers and launch innovation forums with a handful of strategic suppliers. By the fourth, publish the first scorecard and retire redundant reports. In the second year, extend to more categories and embed the measures in individual objectives. Resist the temptation to launch everything at once; a visible win in one category is the best argument for the next.
Procurement transformation of this kind is also a leadership programme. The CPO will spend more time with peers on the executive team, delegate more operational work and accept being measured on outcomes that others influence. That is a real shift of identity, and it deserves explicit support from the CEO and CFO. Without it the scorecard becomes another report that nobody reads.
What to do: within thirty days, share the draft scorecard with the CFO and two business leaders and ask what they would change. Within ninety, publish the first version with baselines. Choose two categories for a pilot of the innovation forum. Revisit the weights after two quarters. Karter McKinley supports scorecard design and operating-model change, working with your finance team on validation.
Questions for the leadership team
- Can we trace savings from identified to contracted to profit and loss?
- Which of the four barriers costs us the most value today?
- Is procurement in the room when product and growth decisions are made?
- Do our measures include revenue and margin, not just cost avoided?
- Which ten suppliers matter most to the next three launches?
- Do we hold a revenue-at-risk map for our critical categories?
- What process will our next technology purchase change, and who owns it?
- Does finance validate the numbers we report to the board?
How Karter McKinley helps
Karter McKinley supports strategy and transformation work, including procurement operating models and scorecards. We help CPOs agree definitions with finance, design the cost, value and resilience measures, and stage the change. We do not promise savings outcomes; each business tests the scorecard against its own data.
Turning strategy into results? Let's talk.
Book a free 30-minute introduction call with our team. No obligation.
Frequently asked questions
Strategic procurement aligns buying decisions with the company's growth, risk and innovation goals instead of focusing on price alone. It covers category strategy, supplier relationships, demand management and resilience. The function is judged on the value suppliers create for revenue, margin and continuity, as well as on cost avoided and savings delivered.
Through supplier-led innovation, speed to market, working capital, quality and resilience. Inverto finds 34% of companies depend on supplier-led innovation, and Deloitte reports innovation enablement at 56% of top performers against 24% of others. Value only counts if finance validates it and a business owner accepts it.
Track supplier-led innovation value, time to qualify suppliers, delivery and quality performance, working capital effects, tier-one supplier visibility and dual-sourcing coverage for critical categories. Inverto reports 56% of impact leaders use company-wide KPIs such as revenue and margin growth. Keep the list short, with named owners and a finance-validated data source.
Savings are lost between identification and delivery through non-compliance, maverick buying, unchanged demand and budget adjustments. Bain found seven out of ten procurement teams lost at least 25% of identified savings. Fix definitions with finance, track yield at each stage and improve contract compliance before setting larger targets.
Expect about eighteen months for a staged programme: audit yield, diagnose barriers, segment suppliers, pilot innovation forums, publish a scorecard, then embed it. Technology can take longer if data is poor. A visible win in one category within the first two quarters builds support for wider change.
- Deloitte — 2025 Global Chief Procurement Officer Survey (press release)
- Digital Commerce 360 — reporting Deloitte's 2025 Global CPO Survey
- Procurement Magazine — Gen AI and talent drive procurement success (Deloitte survey)
- Inverto (a BCG company) — CPO Study 2025: Procurement's Moment of Truth
- The Hackett Group — 2025 Digital World Class Procurement research (vendor benchmark)
- Procurement Magazine — reporting EY Global CPO Survey 2025
- Bain & Company — Procurement's Evolving Mandate: Value Beyond Savings (2022)
- McKinsey & Company — Supply chains: Still vulnerable (2024 survey)